Design and Implementation of an EmergencyPhotovoltaic Power System with AutomaticTransfer for a Maquiladora Plant

Authors

DOI:

https://doi.org/10.46842/

Keywords:

photovoltaic system, battery storage, emergency power supply, automatic transfer switch, maquiladora industry

Abstract

production is complete. This study presents the design, installation, and functional evaluation of an emergency photovoltaic power system for selected Information Systems equipment in a maquiladora plant in Matamoros, Tamaulipas, Mexico. Electrical demand was monitored for approximately 48 hours with a Circutor AR6 analyzer and remained between about 100 and 200 W. A constant design load of 200 W and a six-hour backup target required 1.2 kWh of energy. The installed system included two 160 Wp photovoltaic modules, a 20 A charge controller, two 12 V, 110 Ah batteries connected in parallel, a 300 W inverter, and a single-phase automatic transfer switch. Two existing UPS units remained connected between the backup circuit and the selected equipment. During a simulated utility outage, the switch selected the emergency power supply, and both UPS units continued operating for several minutes. The system also returned automatically to the normal power supply. A review of the original calculations identified the need to distinguish nominal equipment ratings from usable backup energy. The observations support functional operation under the tested conditions. The six-hour backup duration and the actual transfer time remain unverified because the original test did not include a complete discharge measurement or an instrumented record of source changes.

During the period the solar photovoltaic plant was installed, we were informed that an unscheduled power outage occurred over a weekend (a non-working day). This allowed for an automatic functional test of the backup power system’s connection and disconnection processes. The power outage lasted approximately two hours, and there was no need for the systems engineer to be present at the plant.

References

[1] D. Thomas, J. Fung, “Measuring downstream supply chain losses due to power disturbances,” Energy Economics, vol. 114, Art. no. 106314, Oct. 2022, doi: https://doi.org/10.1016/j.eneco.2022.106314

[2] D. Velasco de la Fuente, C. L. Trujillo Rodríguez, G. Garcerá, E. Figueres, R. Ortega González, “Photovoltaic power system with battery backup with grid-connection and islanded operation capabilities,” IEEE Transactions on Industrial Electronics, vol. 60, no. 4, pp. 1571–1581, Apr. 2013, doi: https://doi.org/10.1109/TIE.2012.2196011

[3] C. V. Nayar, M. Ashari, W. W. L. Keerthipala, “A grid-interactive photovoltaic uninterruptible power supply system using battery storage and a back up diesel generator,” IEEE Transactions on Energy Conversion, vol. 15, no. 3, pp. 348–353, Sep. 2000, doi: https://doi.org/10.1109/60.875502

[4] J. De la Torre-Guzmán, E. Salazar-Jácome, W. Sánchez-Ocaña, F. Chávez-Jácome, “Experimental validation of a hybrid photovoltaic backup system for critical load energy resilience: Design, performance assessment, and mathematical model verification,” Sustainability, vol. 18, no. 16, Art. no. 8320, Aug. 2026, doi: https://doi.org/10.3390/su18168320

[5] Y. Badiei, J. Campos do Prado, “Analyzing the impact of electricity rates on the feasibility of solar PV and energy storage systems in commercial buildings: Financial vs. resilience perspective,” Energies, vol. 16, no. 5, Art. no. 2421, Mar. 2023, doi: https://doi.org/10.3390/en16052421

[6] O. Gaevskii, A. Gaevska, V. Ivanchuk, “Backup PV plant for periodic consumers power outages from grid,” Vidnovluvana Energetika, no. 1(72), pp. 27–36, 2023, doi: https://doi.org/10.36296/1819-8058.2023

[7] D. P. Birnie III, “Optimal battery sizing for storm-resilient photovoltaic power island systems,” Solar Energy, vol. 109, pp. 165–173, Nov. 2014, doi: https://doi.org/10.1016/j.solener.2014.08.016

[8] [8] J. Khoury, R. Mbayed, G. Salloum, E. Monmasson, “Optimal sizing of a residential PV-battery backup for an intermittent primary energy source under realistic constraints,” Energy and Buildings, vol. 105, pp. 206–216, Oct. 2015, doi: https://doi.org/10.1016/j.enbuild.2015.07.045

[9] D. L. Ransom, “Choosing the correct transfer switch,” IEEE Transactions on Industry Applications, vol. 49, no. 6, pp. 2820–2824, Nov.–Dec. 2013, doi: https://doi.org/10.1109/TIA.2013.2265376

[10] A. Cabrera-Tobar, V. Ciccariello, E. Lamanna, S. Leva, N. Matera, E. Ogliari, R. Ramaschi, “General rules and safety guidelines for a battery energy storage and photovoltaic system framework in commercial and industrial installations,” IEEE Transactions on Industry Applications, vol. 61, no. 4, pp. 5328–5337, Jul.–Aug. 2025, doi: https://doi.org/10.1109/TIA.2025.3544158

[11] C. V. Matus Silva, “Diseño e implementación de una Planta Solar de Emergencia para la Industria Maquiladora de H. Matamoros, Tamaulipas,” master's thesis, Maestría en Gestión y Auditorías Ambientales, Matamoros, Mexico, 2018.

[12] P. Jivaganont, P. Limthongkul, J. Mongkoltanatas, “Design of photovoltaic and battery energy storage systems through load demand characterization: A case study in Thailand,” Energy Reports, vol. 12, pp. 4578–4593, 2024, doi: https://doi.org/10.1016/j.egyr.2024.10.025

[13] H. Louie, P. Dauenhauer, “Effects of load estimation error on small-scale off-grid photovoltaic system design, cost and reliability,” Energy for Sustainable Development, vol. 34, pp. 30–43, 2016, doi: https://doi.org/10.1016/j.esd.2016.08.002

[14] C. W. Tan, T. C. Green, C. A. Hernandez-Aramburo, “A stochastic method for battery sizing with uninterruptible-power and demand shift capabilities in PV (photovoltaic) systems,” Energy, vol. 35, no. 12, pp. 5082–5092, 2010, doi: https://doi.org/10.1016/j.energy.2010.08.007